Slide-In Bridge Construction

WB Service

Also known as: SIBC, lateral slide

Slide-In Bridge Construction: With slide-in construction, crews assemble the replacement span alongside the bridge it will replace, so traffic keeps using the old one. A brief closure is then used to take out the old span and shift the new one sideways onto the supports.
Slide-In Bridge Construction

The basic method

The replacement span goes up on temporary supports beside the existing structure. During the closure the old deck is taken out and the new one travels across on rails, moved by skid systems, then set down on its bearings.

Reasons to choose it

With access lost only briefly, the technique is a core part of ABC (accelerated bridge construction). For these slides, WB Equipment can provide push-pull cylinders and complete skidding systems.

Our service

Bridge Roll-Ins

This is a WB Equipment service, backed by our own NIST-traceable calibration lab and experienced field technicians.