Bridge Replacement
WB Service
Also known as: bridge span replacement
The process
Crews usually assemble the replacement span alongside the existing one. Jacks raise the old span from its bearings and skidding systems move it clear. The new span is then lifted or slid into position and set down on fresh bearings, with every step closely controlled.
Benefits of hydraulics
- Each movement is measured and precisely controlled
- Extremely heavy spans can be shifted with no need for big cranes
- Because spans are built in advance, closures stay brief
For bridge replacement work, WB Equipment provides jacks, power units, skidding systems and synchronous lifting systems.
This is a WB Equipment service, backed by our own NIST-traceable calibration lab and experienced field technicians.