Found 0 results

Match 0 of 0

Rentals ● Sales ● Service

If it has to be moved, raised or lowered and you don’t know how… – we do!

Call toll free! 866-522-5464 now!

Contact us - request a quote now!

WB Knowledge Base

Hydraulic Terms Explained

What the words mean: jacks, cylinders, pumps, lifting systems, load tests and calibration,
explained simply by WB Equipment, renting, selling and servicing hydraulic equipment since 1981.


Pre-Installation Verification

General Term

Also known as: PIV, pre-installation testing

Pre-Installation Verification: Pre-installation verification, or PIV, checks sample assemblies of high-strength bolts, nuts and washers using a bolt tension calibrator ahead of installation, confirming the tightening procedure achieves the specified tension.
Pre-Installation Verification

The procedure

A few assemblies are taken from every lot and tightened in a Skidmore-Wilhelm calibrator with the exact tools and method the crew will use on the steelwork. The reading confirms whether each bolt achieves the minimum tension set in the specification.

The benefit

Faults in the bolts, the lubrication or the tightening procedure are found before they end up inside the structure. WB Equipment offers Skidmore calibrator rental and does the calibration in our own facility.

View All Skidmore-Calibore

Related equipment

Skidmore-Calibore

Have a question about hydraulic equipment? WB Equipment has answered them for contractors since 1981.