Found 0 results

Match 0 of 0

Rentals ● Sales ● Service

If it has to be moved, raised or lowered and you don’t know how… – we do!

Call toll free! 866-522-5464 now!

Contact us - request a quote now!

WB Knowledge Base

Hydraulic Terms Explained

What the words mean: jacks, cylinders, pumps, lifting systems, load tests and calibration,
explained simply by WB Equipment, renting, selling and servicing hydraulic equipment since 1981.


Uplift Testing

WB Service

Also known as: tension pile test, pull-out pile test

Uplift Testing: In an uplift test, hydraulic jacks pull a foundation pile upward to show it can resist tension, for example from buoyancy, wind or overturning.
Uplift Testing

Test setup

A reaction beam spans the test pile, resting on supports on both sides, with jacks on top. The pile is tied to the beam through a tension connection. Extending the jacks lifts the pile in increments while load cells and gauges log the force and movement.

Purpose

Piles under underground tanks, pipelines, towers and tall buildings can end up in tension. An uplift test checks the design before building starts.

For compression and uplift pile testing, WB Equipment provides calibrated jacks, gauges, load cells and hollow plunger cylinders.

View All Cylinders

Our service

Pile Testing

Related equipment

Hydraulic Cylinders: Aluminum · General Purpose · High Tonnage · Low Height · Pull · Telescopic

This is a WB Equipment service, backed by our own NIST-traceable calibration lab and experienced field technicians.